Zerodeko 2pcs Manual Fuel Transfer Pump Portable Hand Operated Gas and Liquid Pump for Car Oil Drum Water and Fluid Extraction

★★★★★ 4.3 45 reviews

$20.19
Price when purchased online
Free shipping Free 30-day returns

Sold and shipped by qualifsitegdp.gdp.digital
We aim to show you accurate product information. Manufacturers, suppliers and others provide what you see here.
$20.19
Price when purchased online
Free shipping Free 30-day returns

How do you want your item?
You get 30 days free! Choose a plan at checkout.
Shipping
Arrives Sep 29
Free
Pickup
Check nearby
Delivery
Not available

Sold and shipped by qualifsitegdp.gdp.digital
Free 30-day returns Details

Product details

Management number 239322157 Release Date 2026/07/14 List Price $8.08 Model Number 239322157
Category
  • Gas extractor pump:constructed with plastic materials, this pump is built to last and withstand heavy use,car petrol pumps
  • Manual pump: allows for easy and effortless oil extraction,portable pump for gas
  • Oil transfer pump:this manual is versatile and can be used in different situations and environments,handheld gas transfer pump
  • water pump accessories:this is designed to extract oil from drums with ease, ensuring high efficiency,petrol water pump
  • Gas transfer pump manual:the lightweight design of this makes it easy to carry and transport to different locations,portable gas cylinder pump
ASIN B0FF2YSJW5
Fit Type Universal Fit
Brand Name Zerodeko
Item Weight 0.75 Pounds
Manufacturer Zerodeko
Model Number 19EM08SQXGKDF10LVOWAK3
Material Type Plastic
Product Style Modern
Item Type Name fuelpump
Item Dimensions 19.69 x 3.54 x 2.56 inches
Included Components as descirbed
Manufacturer Part Number 19EM08SQXGKDF10LVOWAK3

Correction of product information

If you notice any omissions or errors in the product information on this page, please use the correction request form below.

Correction Request Form

Customer ratings & reviews

4.3 out of 5
★★★★★
45 ratings | 18 reviews
How item rating is calculated
View all reviews
5 stars
80% (36)
4 stars
6% (3)
3 stars
3% (1)
2 stars
1% (0)
1 star
10% (5)
Sort by

There are currently no written reviews for this product.